The last styro stones are set It took one week to settle all the minor difficulties arising in China. E.g. getting the screws for the trestles etc.
Ready to pour concrete Concrete pumps still may cause problems.
Uncertain perspective To get a tube reduction to 800 mm is difficult
Start A lot of spectators for a "dress rehearsal"
A Blow-Out How could that happen?
A simple reason When the stones left the manufacturing plant, two ties were missing. This made it clear that we need to tighten quality control at the manufacturing end. It also emphasized that we need to train the construction site people on how to check before setting a styrostone into the shutter
Training While the repair is done on one side, the training continues on another wall.
Hey Boss! I am styrostoned!! Dress rehearsals with failures convey luck.
|